Work to improve “The Fridge” (peg 16 on Lake Pepper) is nearing completion and the swim is now re-open. A drain has been installed to remove run-off water before it collects in front of the swim. A solid footpath has also been installed to improve access to the swim. And the swim itself has been raised to help it stay drier and keep gear cleaner.
The area to the sides of the peg will be levelled and re-seeded shortly and then left over winter to enable the grass to become established.
Work has now begun on Peg 15.